Klepper, Hahn & Hyatt was the Structural Engineer of Record as well as the Special Inspector for this multi-phase school project. The structural highlight of the project was the Middle School STEAM academy addition that involved partial reuse of an old classroom wing — but only the foundations and floor slab.

The interior bearing wall layout interfered with the desired open floor plan, so the roof and walls were demolished. The new structure spanned completely across the footprint of the original wing using 80-foot-long costellated steel girders cut from W36 steel beams in a zig-zag pattern. The top sections are offset from the bottoms and were re-welded to increase their depth and maximize steel efficiency. This is a relatively rare structural system, but even more rare is the girder is “cranked,” that is, the girders’ top and bottom flanges slope away from a center ridge.

Another unique feature is that the ends of the girders have Manufactured Structural Thermal Break Assemblies (MSTBAs) at the exterior walls, where the girders pass from being inside the thermal envelope of the new building to the outside. The MSTBAs transfer the girders’ shear and bending moments but minimize the thermal losses. The products, manufactured by Schock at their plant in Baden-Baden, Germany, have been used for decades throughout the world, but seldom in the U.S. — until recently. Their 54-inch depth makes them possibly the deepest assemblies ever used in the country.

Structural
Engineering

Landscape
Architecture

Building
Envelope Systems

Sign up for our e-News

Stay in the loop with the latest KHH and industry news.

*You’ll only receive important news once or twice a month.